Control fixed dimensions, wall conditions, services, tolerances and installation responsibility. Field data comes first: the field measurement sheet records what the site actually is, and the tolerance set states how far the finish may deviate.
What the project team should decide.
Fixed joinery is where workshop drawings meet site reality. Survey responsibility, wall and floor condition, service positions, access panels, tolerances and installation sequence must be assigned before manufacture.
A useful quotation names the proposed route and its assumptions. An approval then establishes the drawing, written field or physical sample that production and inspection will follow.
Joinery becomes FF&E only when it can be removed without altering the building. Is millwork part of FF&E? applies that test item by item.
Knock-down modules
Site-fitted panels
Mixed furniture and joinery
Make the requirement comparable.
- 01
Verified site dimensions and datum
- 02
Substrate and finish build-up
- 03
Wall, floor and ceiling interface
- 04
MEP, power and access requirements
- 05
Joint, shadow gap and tolerance
- 06
Installation sequence and responsibility
Questions to resolve before approval.
Production based on unverified site dimensions
Record the selected route, approval reference and responsibility before quotation becomes an order.
Services hidden behind inaccessible panels
Record the selected route, approval reference and responsibility before quotation becomes an order.
Local tolerances not allowed in joints
Record the selected route, approval reference and responsibility before quotation becomes an order.
Factory and site responsibilities overlapping
Record the selected route, approval reference and responsibility before quotation becomes an order.
From material decision to project delivery.
Turn one material decision into a project-ready specification.
Send the drawing, reference image or BOQ item. We will identify missing material, approval and inspection fields.
Substrate · interface · site fit
What the project team should decide: Joinery & Site Interfaces
A board, veneer or joinery decision is not made by material name alone. Match each component to span, screw holding, shaping, moisture exposure, finish, transport and the real site interface.
| Check | Design conversation | Technical/procurement record |
|---|---|---|
| Component duty | Where the part sits and what should remain visually quiet | Panel function, span, load, fixing and service access |
| Build-up | Edge, profile, grain direction and junction expression | Substrate, veneer/laminate, thickness, balancing and edge construction |
| Site condition | Shadow gaps, scribes and relationship to walls or floors | VIF dimensions, plumb/level condition, tolerance and installation sequence |
| Approval | Acceptable colour and natural variation | Reference sample, drawing revision, moisture condition and release status |
Bring to the review
Latest drawing or rendering, quantities, intended use, destination, material references, current quotation assumptions and unresolved comments.
Keep after the review
Approved revision, sample identity, decision limits, exceptions, responsible party and the evidence required before the next release.
Can two suppliers quote the same material name and still offer different quality?
Yes. Substrate, grade, thickness, finish build, hardware, fabrication and approval basis can differ. Compare the complete build-up and sample route.
What should be approved before bulk production?
Approve the drawing revision and the sample level appropriate to the risk: material or finish reference, prototype, mock-up or first-production piece.