Owner
What decision will this tool clarify?
Budget readiness, programme allowance, scope completeness or the trade-off behind a material and delivery choice.
YUESHANDECODesign-led custom furniture & FF&E delivery partner in ChinaSubmit a project ↗Practical calculators and brief builders for interior designers, hotel owners, developers and procurement teams. No registration required. If you already know the decision but not the format, the stage-based selector matches a tool to it, and the decision guides explain the method behind each result.
01 — 06
Use these tools to organise quantities, specifications, materials, shipping information and project readiness. Results are indicative and designed to support a professional technical review.
Compare two FF&E quotations by materials, construction, finishes, compliance, packing and commercial scope before choosing the lower price.
Open free tool ↗02Check whether an FF&E BOQ includes the dimensions, materials, finishes, quantities, performance and commercial fields suppliers need to quote consistently.
Open free tool ↗03Build an FF&E budget from your supplier price and additional packing, transport, duty, tax, handling, installation and fee amounts. Unknown costs stay visible.
Open free tool ↗04Compare direct factory, hybrid, local and managed FF&E sourcing based on customization, supplier count, site risk, schedule and compliance needs.
Open free tool ↗05Build a contract upholstery fabric checklist from traffic, cleaning, staining, light exposure, application and relevant performance criteria.
Open free tool ↗06Build a clearer custom sofa RFQ covering frame, joints, suspension, foam, fill, upholstery, dimensions, hardware, testing, approvals and packing.
Open free tool ↗Check whether two furniture quotations include the same materials, construction, finish, approvals, quality control and packing scope.
Open tool ↗Create a furniture specification checklist covering substrates, finishes, upholstery, hardware and quality evidence.
Open tool ↗Choose an initial upholstery fabric route by project use, performance priority, appearance and maintenance expectations.
Open tool ↗Check whether a furniture package contains enough information for meaningful costing, sampling and production review.
Open tool ↗Turn a hotel room schedule into an editable furniture quantity summary for early procurement planning.
Open tool ↗Explore a starting stone direction by application, visual priority and maintenance, then confirm the actual product, support and fabrication requirements.
Open tool ↗Estimate a rough fabric allowance for dining chairs, lounge chairs, sofas, banquettes and upholstered headboards.
Open tool ↗Estimate packed volume, weight and indicative utilisation for 20GP, 40GP and 40HQ containers.
Open tool ↗Create a six-field enquiry summary while the furniture project is still at concept stage.
Open tool ↗Plan milestones backward from delivery or opening across approvals, sampling, production, QC, shipping, receiving and installation.
Open tool ↗Use end-use context to identify a relevant fire-test family for upholstery, wall applications or drapery, then verify project jurisdiction.
Open tool ↗Run a room- or zone-based FF&E pre-punch with item IDs, issue types, photos, responsibility and closeout tracking.
Open tool ↗Capture width, height, diagonals, level, plumb, openings, services, adjacent finishes and planned scribe zones.
Open tool ↗Assign responsibility for specification, approval, purchase, receiving, storage, installation, inspection, claims, warranty and closeout.
Open tool ↗Create a structured RFQ covering specification, quantity, samples, lead time, packing, Incoterm, warranty, exclusions and commercial terms.
Open tool ↗Record item ID, revision, material, finish, comments, approval status, date, approver and retained-sample reference before batch production.
Open tool ↗A project conversation
A calculator or checklist is not a substitute for design judgement. It helps the owner, procurement team and designer expose assumptions before requesting a quotation or approval.
Owner
Budget readiness, programme allowance, scope completeness or the trade-off behind a material and delivery choice.
Procurement
Quantity, dimensions, destination, package scope, approval route and commercial assumptions—not generic defaults hidden from the result.
Designer
As a discussion brief that returns to drawings, specifications and samples before a production decision is made.
Share the latest drawings or rendering, furniture schedule or BOQ, room quantities, destination, target programme, material references and the decisions that are still open. We will identify what can be quoted now and what should be clarified before production.