← Guides & tools

FF&E Landed Cost Calculator: Compare the Whole Cost

Build an FF&E budget from your supplier price and additional packing, transport, duty, tax, handling, installation and fee amounts. Unknown costs stay visible. Where the gap is installation rather than freight, imported versus local joinery tests whether the route still pays; the export packing specification sets the packing cost you are entering.

Short answer

What should a project buyer know?

The supplier price may not cover the whole project. Enter that price and only the additional costs not already included. The worksheet adds buyer-entered amounts in USD; it does not calculate duty or tax rates. Arrival costs and the wider budget including installation, professional fees and contingency are shown separately.

Amounts in USD, excluding double-counted charges

Enter every amount. Use 0 only when confirmed included elsewhere or not applicable. Blank means unknown. Duty and tax are amounts, not percentages.

How to use this tool

01

Enter amounts on one consistent basis

Start with the supplier price and enter only costs not already included in it. Use USD throughout, converting other currencies using your chosen dated rate before entry. Blank means unknown and prevents a total; enter 0 only for an amount confirmed as included or not applicable. Record the quote, delivery term, date and cost sources in the notes.

Request a written price basis and exclusions ↗

02

Why duty and tax are entered as amounts

This is a budget worksheet, not a customs calculator. Enter the duty and tax amounts confirmed or estimated for your transaction by the appropriate provider. It does not choose a tax base, rate, product classification or destination rule. It does not automatically deduct recoverable tax or combine taxes. Keep those assumptions in your notes.

Confirm the delivery scope and destination charges ↗

03

Read the two totals separately

The arrival subtotal adds the supplier price, additional packing, freight, insurance, duty, tax, broker, receiving, storage and local delivery. The wider project total also adds installation, professional fees and a contingency allowance. These labels describe this worksheet only. Enter each charge once; neither total proves a complete contractual landed cost or guaranteed project budget.

Check the professional-fee calculation basis ↗

04

Use the estimate to resolve open costs

Compare scenarios only when specification, quantity, currency and included services match. If a price includes transport or taxes, do not add them again. Record unresolved exclusions and confirm them before relying on the budget. Print or copy the estimate to preserve inputs; the page does not fetch live rates or save a project history.

Review whether the offers are comparable first ↗

Questions before you proceed

Are the duty and tax values current rates?

No. You enter transaction-specific amounts. The worksheet neither supplies rates nor calculates customs liability.

Why is there no total when a field is blank?

A blank cost is unknown, not zero. Enter a supported amount, or 0 if it is confirmed as included elsewhere or not applicable, and record that basis.

Review Yueshan's procurement scope or send your current item list and open questions.

Use the result as a starting point.

Compare a factory price with the wider project cost without relying on stale universal duty or freight rates. Estimate only. Confirm current duties, taxes, freight, customs treatment and destination charges with qualified providers. For the commercial decision this tool supports, review the delivery and landed-cost scope.

Check Whether Importing Fits Your Project ↗Materials & quality evidence ↗

Sources and assumptions

Last reviewed: September 9, 2026

A project conversation

Landed cost is a scope model, not a universal percentage.

A useful estimate separates product value from packing, inland movement, freight, insurance, duties, destination handling, storage and installation assumptions.

Owner

What does the result help compare?

Different sourcing routes and delivery terms on a more complete basis than factory unit price.

Procurement

Which inputs must be confirmed locally?

Tariff classification, duty/tax, port and handling fees, delivery access, storage and installation costs.

Designer

Why does landed cost matter to design?

Heavy stone, oversized pieces, fragile finishes and assembly strategy can change logistics cost and therefore the viable design solution.

Bring to the conversation

Share the latest drawings or rendering, furniture schedule or BOQ, room quantities, destination, target programme, material references and the decisions that are still open. We will identify what can be quoted now and what should be clarified before production.

Continue the project decision

Related technical and commercial conversations