← Guides & tools

Hotel Furniture BOQ Builder

Turn a hotel room schedule into an editable furniture quantity summary for early procurement planning. Quantities are only half the brief: the hotel procurement route sets who buys, and the model-room release sets what may be produced.

Room schedule

Enter non-negative whole room counts. This example assumes: king room—1 bed base, 1 headboard, 2 bedside tables and 1 lounge chair; twin room—2 bed bases, 1 headboard, 1 bedside table and 1 lounge chair; suite—1 bed base, 1 headboard, 2 bedside tables and 2 lounge chairs. Replace these assumptions with the accepted room-type schedule before issuing an RFQ.

Use the result as a starting point.

Build a clearer room-by-room quantity brief before requesting a formal quotation. Every custom furniture project still requires confirmed drawings, material samples, applicable standards and logistics information. For the commercial decision this tool supports, review the FF&E service scope.

Request technical review ↗Materials & quality evidence ↗

Inputs · assumptions · usable output

What the project team should decide: Hotel Furniture BOQ Builder — Free Online Tool

Use the result as a project conversation, not as an automatic order. Check the quantity basis, units, packing or utilisation assumptions and exclusions before the output is issued as an RFQ, budget or loading instruction.

Before using the resultQuestionNext document
Input basisAre room types, quantities, dimensions and units current?Room matrix, BOQ revision or measured schedule
AssumptionsWhich waste, packing, clearance or utilisation factors were used?Visible assumption record attached to the output
ReviewDoes the result agree with drawings and supplier constraints?Design/procurement comment and correction
IssueWho may rely on this version and for what decision?Dated export with status: estimate, RFQ, approval or release

Bring to the review

Latest drawing or rendering, quantities, intended use, destination, material references, current quotation assumptions and unresolved comments.

Keep after the review

Approved revision, sample identity, decision limits, exceptions, responsible party and the evidence required before the next release.

Can this output be sent directly as a purchase order?

Not without review. Reconcile the output with current drawings, specifications, quantities, supplier constraints and commercial terms.

Why are assumptions shown?

Because a useful estimate lets the next reviewer see what may change the result instead of hiding those factors inside the calculation.