YUESHANDECODesign-led custom furniture & FF&E delivery partner in ChinaSubmit a project ↗FF&E Specification Standard
Turn a visual reference into fields that can be quoted, approved and inspected. Fill the fields with the specification builder, then check them against the inspection criteria before release.
What the project team should decide.
A specification is the shared language between design, procurement, manufacturing and quality control. It should define what matters, identify the approval reference and make supplier assumptions visible. The exact fields vary by product, but a custom furniture specification may include:
A useful quotation names the proposed route and its assumptions. An approval then establishes the drawing, written field or physical sample that production and inspection will follow.
A specification is the record that keeps a package comparable. What a complete FF&E specification contains lists the fields this page assumes are already filled in.
Written specification
Dimensioned drawing
Physical control sample
Make the requirement comparable.
- 01
Product identity: item code, name, room or area and quantity
- 02
Dimensions: overall width, depth, height, seat height and relevant clearances, against the approved revision
- 03
Base materials: solid timber, plywood, MDF, metal, stone or glass by component
- 04
Visible finishes: veneer, paint, lacquer, powder coating, plating or stone, with the approved sample reference
- 05
Upholstery: fabric or leather, COM/COL status, foam, webbing, stitching and cushion construction
- 06
Hardware: hinges, runners, connectors, levellers, glides and handles
- 07
Performance requirements: structural loading, fire performance, abrasion, moisture and commercial-use durability
- 08
Approval requirements: finish and material samples, shop drawing, prototype and mock-up — an approval chain, not decisions inside email threads
Questions to resolve before approval.
Images treated as complete technical information
Record the selected route, approval reference and responsibility before quotation becomes an order.
Different revisions used by design and factory
Record the selected route, approval reference and responsibility before quotation becomes an order.
Approved samples not connected to item codes
Record the selected route, approval reference and responsibility before quotation becomes an order.
Exclusions discovered only after order
Record the selected route, approval reference and responsibility before quotation becomes an order.
From material decision to project delivery.
Turn one material decision into a project-ready specification.
Send the drawing, reference image or BOQ item. We will identify missing material, approval and inspection fields.
Design intent · technical definition · shared decisions
What the project team should decide: FF&E Specification Standard
FF&E work is the coordination of objects, materials, documents and responsibilities that make an interior usable and buildable. The page should help each party understand the next decision, not simply repeat a definition.
| Perspective | Question to resolve | Useful output |
|---|---|---|
| Owner | What experience and operating result must be protected? | Priorities, package boundaries, programme and approval authority |
| Designer | Which relationships give the space its character? | Selections, specifications, drawings, samples and controlled details |
| Procurement | What is being priced and compared? | Common scope, quantities, inclusions, exclusions and commercial assumptions |
| Technical/delivery | What must fit, repeat, travel and be released? | Interfaces, revisions, inspections, packing and closeout records |
Bring to the review
Latest drawing or rendering, quantities, intended use, destination, material references, current quotation assumptions and unresolved comments.
Keep after the review
Approved revision, sample identity, decision limits, exceptions, responsible party and the evidence required before the next release.
What should the client send first?
Send the latest plans or renderings, schedule or BOQ, quantities, destination, programme and the decisions that remain open.
Does every project need the same approval process?
No. The route depends on design risk, repetition, material variation, destination requirements and what the project team must verify before release.