01

1–2 · Revision, scope and item ID

Confirm the latest dated revision, drawing register, item code, quantity and location. Mark superseded sheets so they cannot return to production.

02

3–4 · Views, sections and dimensions

Use plans, elevations, sections and details as needed to show the complete product. Identify datums, critical dimensions, clearances and tolerances.

03

5 · Verify in field

Show which dimensions require field verification, who supplies them and the hold point before fabrication.

04

6–7 · Materials, finishes and samples

Identify visible and concealed materials, grain or pattern direction, finish references, sample codes and approved ranges.

05

8–10 · Hardware, attachment and interfaces

Check load, operation, access, fixing substrate, adjacent finishes, MEP points and responsibility for related work.

06

11–12 · Substitutions and approval status

List changes separately with their impacts. State whether the drawing is for review, approved as noted, resubmit or released for production.

07

Change control: how a revision becomes the approved version

A change is not approved because it was agreed in a meeting. It is approved when it appears on the controlled drawing, the item code, the finish schedule and the approval record at the same revision. Anything less leaves two versions in circulation, and production will follow whichever one reaches the factory.

Keep one change register per package with five fields: what changed, which items are affected, who requested it, what it does to cost and programme, and which revision now supersedes the previous one. Close the record by withdrawing the superseded revision rather than leaving it available, because an available drawing is a drawing that can be quoted from.

  • Change stated against an item code, not a room or a photograph
  • Superseded revision withdrawn, not merely marked
  • Cost and programme effect recorded before release
  • Approval signed against the new revision

Carry accepted changes into bulk production ↗

Approve a material substitution ↗

See where drawing control sits in the FF&E decision path ↗

08

How should an audit comment be closed?

Use one issue reference per unresolved decision. Record the drawing and revision, item and location, conflicting requirement, proposed correction, responsible reviewer and the evidence needed to close it. A marked-up PDF is useful only if its comments reach the next drawing issue.

For example, a wardrobe elevation may show a door opening into a bedside light. Record the conflict, ask the responsible designer to resolve the clearance, and check the revised plan and elevation together. This is an illustrative coordination example, not a completed YUESHAN project. Do not let an unanswered note disappear when a drawing is reissued.

Resolve field dimensions before closing fit-related comments ↗

09

Who reviews what before release?

Agree responsibilities for design intent, field measurement, fabrication details, adjacent trades and any required engineering review. A supplier can develop construction information without owning every site measurement or professional approval. Identify the approving party in the project record rather than assigning authority through a generic checklist.

Keep review status separate from production release. Where an issue affects fit, material or function, hold the affected scope until the required decision is documented. An accepted finish sample does not settle missing fixing details or unverified site dimensions.

Separate approval with comments from production release ↗

Prepare traceable site measurements for the drafter ↗

10

What should a release package contain?

Name the accepted drawing issue, item schedule, field verification record, finish or sample references, closed comments and authorized release scope. Keep superseded revisions available for traceability but clearly excluded from current manufacture. If information changes after release, identify affected items and restart the necessary review instead of editing the baseline silently.

Send the current drawings and an unresolved-issue list when requesting a review. Do not send only a rendering and assume it contains installation, fixing and service information.

Discuss design-development scope and required inputs ↗

Submit the current drawing revision for project review ↗

Start a bespoke item from the agreed development fields ↗

11

Cross-checking the finish schedule against the drawings

A finish schedule and a drawing set drift apart in a predictable way. The schedule is written once and updated in one place, while the drawings are revised item by item. The result is a drawing naming a finish code that no longer exists, a code that sits on the schedule but is used on no drawing, or two item codes pointing at the same code for visibly different surfaces.

Run a three-way reconciliation at each revision: every finish code on a drawing must exist on the schedule, every code on the schedule must appear on at least one drawing or be marked reserved, and every item code must carry exactly one finish reference per visible surface. Where an item uses a base and a top in different materials, the drawing has to carry both, because a single code on the item line hides the second surface.

The check catches more than typing errors. It catches substitutions agreed verbally and never written back, items re-specified after the sample round, and surfaces that were never assigned at all. Those are usually the interiors, the underside and the back of a freestanding piece, which get defaulted at the factory and discovered at inspection.

  • Every finish code on a drawing exists on the schedule
  • Every schedule code appears on a drawing, or is marked reserved
  • One finish reference per visible surface, including interiors and backs
  • Base and top materials recorded separately where they differ
  • Substitutions written back to both documents with the approval reference
  • Retired codes removed from the set rather than left in place

Agree how colour and gloss will be judged ↗

Record the veneer variation that was approved ↗

Continue the decision path

Related FF&E resources

Shop drawings & site interfaces: guides and tools ↗Start with the FF&E pillar guide ↗Field measurement sheet ↗Substitution control ↗Design development ↗Browse all FF&E guides ↗

Discuss Your Drawing Review Scope

This checklist supports coordination; it does not replace the design professional or engineer where required. AWI references concern architectural woodwork, not universal FF&E certification.