01

Make the decision in this order

  1. Choose cut and flitch strategy
  2. Define book, slip or other matching
  3. Prioritise the visible faces
  4. Approve a representative range or dry layout
  5. Retain finish references for bulk control
02

What the specification or approval should record

  • Species, cut, flitch or lot reference
  • Leaf and panel matching method
  • Grain direction by elevation
  • Accepted colour and grain range
  • Stain, coating, sheen and sample code
  • Replacement and rematching expectations
03

Evidence before claim

Use real range samples, panel layouts and retained finish references rather than photography alone.

Claim boundary: Do not promise identical colour or grain across a natural material.

Veneer variation is accepted or rejected against an approved sample. Which FF&E documents carry that approval forward lists the records that survive to production.

Set a Veneer Approval Standard

Send the current drawing, BOQ, sample reference or supplier proposal. We will identify the fields that still need a project decision.

Submit your project for review ↗

Sources

External standards and product data can change. Verify the current requirement for the product, destination and project.