Make the decision in this order
- Identify species and wood-based components
- Review construction and grain direction
- Define the measurement method and inspection points
- Plan factory, container and destination conditions
- Allow movement where the design requires it
What the specification or approval should record
- Species, component and supplier lot
- Meter type, location, date and readings
- Factory temperature and relative humidity
- Destination climate and storage expectations
- Joinery, panel and allowance details
- Exceptions, corrective action and release status
Evidence before claim
Retain moisture-check records and construction details, then relate them to actual storage and destination conditions.
Claim boundary: Never promise zero warping or treat one moisture range as universal for every species and climate.
Moisture condition is a destination question, not only a workshop one. Where packing and logistics assumptions are fixed in the FF&E lifecycle shows when that decision has to be made.
What a moisture requirement should say, beyond a single number
A clause that states eight to twelve percent without saying where, how and when the reading was taken gives the factory nothing to inspect against and the buyer nothing to argue with. The useful requirement names the meter type, the reading locations on the component, how many readings per lot, the condition of the material when it was read, and the environment it is being prepared for.
Equilibrium matters more than the target figure. Timber settles towards the moisture content of the air around it, so a component built at twelve percent and shipped to a humid coastal destination takes up moisture and moves, while the same component built at eight percent and sent to a heated dry interior loses it and shrinks. The destination climate, the container journey and the storage before installation belong inside the requirement rather than in the background notes.
Pin meters and capacitance meters read differently, and both read the surface more strongly than the core. That is why the method has to be named, and why readings should be taken after the material has stood in the workshop long enough to equalise, not at the moment it arrives from the mill.
| Element | What to write | Why it matters |
|---|---|---|
| Scope | Which components and which species the clause covers | Solid timber, veneered board and MDF behave differently |
| Method | Pin meter or capacitance meter, with make and model | The two read differently and are not interchangeable |
| Locations | Where on the component readings are taken, and how many per lot | Surface readings hide a wet core |
| Timing | After acclimatisation in the workshop, before machining | A reading at the mill gate proves very little |
| Condition | Factory temperature and relative humidity at the time of reading | A reading means little without the surrounding air |
| Destination | Expected service climate, and the storage before installation | Movement is driven by the gap between factory and site |
| Records | Who records, on what form, and who reviews the exceptions | An unrecorded reading cannot support a decision |
Review the Wood Specification
Send the current drawing, BOQ, sample reference or supplier proposal. We will identify the fields that still need a project decision.
Submit your project for review ↗Sources
External standards and product data can change. Verify the current requirement for the product, destination and project.
YUESHANDECODesign-led custom furniture & FF&E delivery partner in ChinaSubmit a project ↗