Check who you are buying from
Record the legal contracting name, business details, address and payment beneficiary. Resolve differences through a known contact before payment. These checks establish identity; they do not show that the supplier can make your particular furniture. Keep sensitive company and banking records in your agreed project system, not in a public enquiry.
Ask for evidence of comparable work
Choose a representative item from your package and ask how it would be made. A stone-and-metal table needs different capability from an upholstered chair. Compare material handling, joint details, finish samples, quantities and inspection records for similar work. Request permission to use any reference material; a borrowed image is not evidence of the supplier's own production.
Can they explain the drawing and proposed changes?
Ask the supplier to identify missing dimensions, fixing details and material requirements, rather than simply saying they can make the picture. Where architectural woodwork uses AWI requirements, submittals and proposed changes need the specified review. For your order, name the drawing revision and require changes to be recorded separately, with effects on appearance, use, price and timing.
Review the drawing before treating it as a production instruction ↗
Can they repeat the approved sample?
Request a proposed sample route, material availability, production sequence, inspection points and response to failed checks. A good sample does not confirm current capacity or batch consistency. Ask what work is outsourced and who inspects it. If a key process or finish cannot be verified, leave that item pending rather than averaging the problem into an overall supplier score.
Check delivery and corrections before award
Review packing for the actual item, carton identification, consolidation, replacement parts and the process for reporting a defect. Name who pays or acts under the agreed terms; do not assume that the manufacturer also performs site installation. Ask for the contact and records needed to raise an issue after delivery.
Record a decision with conditions
For each requirement record the evidence received, reviewer, date, unresolved question and next action. Use clear decisions such as suitable for this scope, pending evidence, or not suitable for this item. Qualification is specific to the scope and available evidence—not a lifetime endorsement. Send shortlisted suppliers the same enquiry package before comparing their offers.
How order quantity changes the quotation
A custom furniture quotation is built from development cost, set-up cost and unit cost, and the first two do not fall when the order falls. That is why a 120-room hotel package and a single villa room cannot carry the same unit price, and why a supplier offering one rate for both has either priced the small order high or intends to recover the difference later. Ask which quantity band the quoted price is valid for, and how a smaller or larger order is re-priced. Ask also whether prototype and first-article cost is charged separately, and whether it is refundable against the order and the deposit.
Which minimum is being quoted, and what happens when you cross it
Four different things get called a minimum, and they are breached differently: the smallest batch that will be tooled and programmed at all; the quantity at which the quoted unit price still holds; the quantity at which packing and shipping become economic; and the quantity a supplier needs to justify holding material. Material is usually the real constraint rather than labour, because a veneer, a stone range, a specific textile or a profiled metal section can carry a mill minimum, a dye lot minimum, or a single hide or single slab issue. Where the specified material has a minimum above the required quantity, the options are to hold the surplus as attic stock, change the material, or accept a documented price adjustment. Choose one and record it, because it becomes a variation argument later. Confirm as well whether mixed batches are accepted across items, colours or project phases, and what the minimum repeat order is for replacement batches after handover.
Where a minimum belongs, and where it does not
For custom furniture and project-based B2B work, YUESHAN does not set a minimum order quantity. Development, set-up and first-article cost is quoted as its own line instead of being recovered by inflating a unit rate, so a single villa room can be produced without being priced as though it were a hotel floor. What matters to check is not whether a minimum exists but whether the set-up cost is visible: a supplier quoting one rate for a 120-room package and a single room has either loaded the small order or intends to recover the difference through variations.
The one part of a package that does carry a floor
The accessories and styling side of an FF&E package is a different business from furniture, and it is the one place where a minimum order value applies: USD 5,000 per order. Cushions, throws, vases, trays, artwork and small decorative pieces are picked, checked, wrapped and re-packed by piece, often across dozens of separate SKUs, so handling cost per unit does not fall when the order falls. On a full furniture package this side is usually a small fraction of the value and the floor never binds. On a styling-only refresh, or a top-up order after handover, it does — which is worth knowing before the schedule is written rather than after the quotation arrives.
Questions before you proceed
Does a business registration prove furniture quality?
No. Identity checks and evidence of manufacturing capability answer different questions. Both need review for the actual project.
Is subcontracting automatically a reason to reject a supplier?
No. Ask which work is outsourced, who controls its specification and inspection, and who is responsible for corrections. Unclear responsibility is the issue to resolve.
Review Yueshan's procurement scope or send your current item list and open questions.
Evaluate a Supplier
Registration and one audit do not guarantee future performance; qualification should match the actual project scope.
Submit your project for review ↗Sources
Last reviewed: September 9, 2026. External guidance can change; verify current project requirements.