Define base metal, fabrication, weld quality, texture, colour and protective finish. Put base metal and protective finish on the specification record, and check weld and coating at the inspection stage.
What the project team should decide.
A brass-colour reference can describe stainless steel PVD, plated steel, painted aluminium or actual brass. These routes differ in cost, edge appearance, durability, repair and colour consistency.
A useful quotation names the proposed route and its assumptions. An approval then establishes the drawing, written field or physical sample that production and inspection will follow.
A finish route depends on the base metal, not on the colour name. What a complete FF&E specification has to record lists the fields a quotation should answer.
Mild steel / plated
Aluminium / anodised
Solid brass
Make the requirement comparable.
- 01
Base metal and section thickness
- 02
Fabrication and visible weld standard
- 03
Brushed, polished or textured direction
- 04
Plating, PVD, anodising or paint system
- 05
Colour and sheen control sample
- 06
Protection, care and approved variation
Questions to resolve before approval.
Finish specified without identifying base metal
Record the selected route, approval reference and responsibility before quotation becomes an order.
Visible welds and corners reviewed too late
Record the selected route, approval reference and responsibility before quotation becomes an order.
Different production batches showing colour shift
Record the selected route, approval reference and responsibility before quotation becomes an order.
Coating route unsuitable for wear or location
Record the selected route, approval reference and responsibility before quotation becomes an order.
Does a brass colour mean solid brass?
No. Separate the base metal from the visible finish in every enquiry. Ask the supplier to identify the material and process actually proposed, including concealed surfaces and cut edges. Review the completed detail rather than approving a colour name alone.
- Name the base material and section dimensions.
- State the coating or finishing process without assuming it from appearance.
- Show joints, corners and visible welds on the review detail.
How should indoor and exposed applications be compared?
Describe moisture, cleaning, contact and any exterior exposure to the supplier. Request a suitable system and the evidence needed for that specific use. Neither ‘stainless’ nor a gold finish, by itself, guarantees the result in every environment.
- Identify exposed edges, fixings and dissimilar-material interfaces.
- Agree cleaning and touch-up limitations for the proposed finish.
- Review a representative fabricated sample, not only a flat swatch.
What should remain visible when comparing metal prices?
Separate material/section, fabrication, preparation, finish, quantity and packing assumptions. If a supplier changes one, ask for the resulting appearance, maintenance and drawing implications. An approved colour reference should not silently authorize a different base material.
- Keep the approved process and sample code with the order.
- Record substitutions and the person authorized to decide.
- Inspect before protection hides the finished surfaces.
Before and after: make the description usable.
Illustrative fields — not an approved production specification.
Instead of ‘brushed brass legs’: identify base metal, section and wall thickness, joint/weld detail, surface preparation, coating route, brushing direction, colour/sheens sample, fixing detail and agreed inspection reference. Do not infer solid brass from a brass-colour image.
What evidence should accompany approval?
Request a labelled sample made by the proposed finish route, a representative corner/weld detail and the product/process documents required for the intended exposure. Record what was inspected and the acceptance reference; a finish photo is not proof of corrosion or structural performance.
Keep material code, supplier reference, item, revision, date, decision owner and approval scope together. Unresolved information remains a clarification request.
Once the fields are defined, compare the quotations against that common specification. Then agree the sampling and approval scope before manufacture.
From material decision to project delivery.
Turn one material decision into a project-ready specification.
Send the drawing, reference image or BOQ item. We will identify missing material, approval and inspection fields.
Design intent · technical definition · shared decisions
What the project team should decide: Metal Finishes for Furniture
FF&E work is the coordination of objects, materials, documents and responsibilities that make an interior usable and buildable. The page should help each party understand the next decision, not simply repeat a definition.
| Perspective | Question to resolve | Useful output |
|---|---|---|
| Owner | What experience and operating result must be protected? | Priorities, package boundaries, programme and approval authority |
| Designer | Which relationships give the space its character? | Selections, specifications, drawings, samples and controlled details |
| Procurement | What is being priced and compared? | Common scope, quantities, inclusions, exclusions and commercial assumptions |
| Technical/delivery | What must fit, repeat, travel and be released? | Interfaces, revisions, inspections, packing and closeout records |
Bring to the review
Latest drawing or rendering, quantities, intended use, destination, material references, current quotation assumptions and unresolved comments.
Keep after the review
Approved revision, sample identity, decision limits, exceptions, responsible party and the evidence required before the next release.
What should the client send first?
Send the latest plans or renderings, schedule or BOQ, quantities, destination, programme and the decisions that remain open.
Does every project need the same approval process?
No. The route depends on design risk, repetition, material variation, destination requirements and what the project team must verify before release.