Make the decision in this order

  1. Choose the material category
  2. Review actual slabs or product range
  3. Define finish, thickness and edge
  4. Coordinate support, reinforcement and fabrication
  5. Plan sealing, maintenance, packing and replacement
02

What the specification or approval should record

  • Material name, supplier and slab/product reference
  • Approved colour and visual range
  • Thickness, finish and edge profile
  • Cut direction, joints and dry layout
  • Support, reinforcement and fixing
  • Sealing, care, packing and replacement plan
03

Evidence before claim

Use actual slab or range approvals, fabrication details and current product data for the selected material.

Claim boundary: Origin or market price is not a technical grade, and natural stones do not all require identical treatment.

Stone is a fixture decision when it is built in and a furniture decision when it forms a loose or table-top element. The FF&E scope boundary sets out which package owns each case.

Should the project use natural marble or a manufactured surface?

Start with the intended appearance, repeated quantity, cleaning routine and replacement needs. Then compare actual proposed products. A small colour chip cannot settle the appearance of a large top, and a material category alone cannot establish suitability for a particular span or edge detail.

  • Review the visible pattern at furniture scale.
  • Record whether repeatability or individual variation is the design priority.
  • Compare care instructions and fabrication limitations for each offered product.

Why can two similar stone tops have different prices?

Ask for the priced slab range, cutting layout, edge build-up, support, finishing and protective packing. These inclusions make a quotation understandable. Review any alternative against the same drawing and accepted visual range instead of treating a lower unit price as an automatic saving.

  • State whether slab selection and dry layout are included.
  • Identify joints, openings, reinforcement and fixing responsibilities.
  • Keep fabrication and packing exclusions alongside the price.

What should you do with a selector result?

Use it to prepare a discussion, not to release a material. Send the suggested direction together with the top dimensions, support concept, room use and reference image. The actual product and fabrication proposal still need review.

  • Confirm the product rather than only its category.
  • Agree the sample, layout and cutting-release sequence.
  • Retain care instructions for the receiving team.

Before and after: make the description usable.

Illustrative fields — not an approved production specification.

Instead of ‘beige marble top’: state material and slab/product reference, accepted range, finished thickness, finish, edge detail, support drawing, sealing/care proposal and dry-layout approval reference. These are fields to agree, not a universal thickness recommendation.

What evidence should accompany approval?

Request photographs tied to the actual slab or product reference, a marked cutting/layout proposal, selected-product technical information and the approved fabrication/support detail. Keep approval scope and remaining decisions visible before cutting.

Keep material code, supplier reference, item, revision, date, decision owner and approval scope together. Unresolved information remains a clarification request.

Once the fields are defined, compare the quotations against that common specification. Then agree the sampling and approval scope before manufacture.

Compare Stone Options

Send the current drawing, BOQ, sample reference or supplier proposal. We will identify the fields that still need a project decision.

Submit your project for review ↗

Sources

External standards and product data can change. Verify the current requirement for the product, destination and project.