Define what the price must include
A comparable quotation needs a controlled scope. Drawings and schedules should distinguish loose furniture, joinery, upholstery, stone, metalwork, hardware, interfaces and packaging. The full field list sits in the hotel furniture specification framework.
Core fields for every item
Specifications should make quality measurable rather than relying on a reference image.
- Overall and critical dimensions
- Substrate, veneer and finish system
- Stone, metal, glass and upholstery details
- Hardware, structure and load expectations
- Sample, inspection and packaging requirements
Connect the schedule to approvals
Each finish and prototype should carry a reference, revision and approval status so procurement and production work from the same information. Run the BOQ readiness check before the package is issued for quotation, and record material decisions against the materials and quality framework. A schedule describes individual items, but a room is what confirms them together, which is the case set out in the case for a model room before the bulk order.
Performance requirements belong to the product, not to the project type
Writing 'contract grade' or 'hotel standard' into a schedule does not define a requirement, and two suppliers will read it differently. State the applicable requirement against the actual product and its use: upholstery performance for the seating in question, finish behaviour for the surface, load expectation for the piece. Where a project or brand standard applies, name it and its edition, and let the offered product answer to that document rather than to a description.
Separate what is fixed from what is still open
A specification issued for quotation is allowed to contain open decisions, provided they are named and assigned. Mark each field as fixed, provisional or open, and record who closes it. That one discipline prevents the most common quotation problem: suppliers pricing an assumption they never state, which then gets treated as agreed. The design-to-production readiness checker produces that list before the package leaves the office.
The fields buyers most often leave out
In practice the omissions cluster in the same places. Review the schedule for these before issuing it, because each one returns later as a variation.
- Fixing and interface responsibility for fitted items
- Packing method, carton marking and room coding
- Sample and first-article approval reference
- Accepted natural variation in grain, shade and stone figure
- Spare parts, glides and replacement references
Who closes each open field
Every open field in a schedule should name the party who closes it: designer, operator, engineer, supplier or buyer. An unnamed open field is not an open question, it is a decision waiting to be made by whoever notices it last — and in practice that is the factory, at the point where changing it is most expensive. One responsibility column beside the fields is usually enough, provided it is filled in rather than left blank until the kick-off meeting.
Working on a furniture or FF&E package?
Send the project information for an initial design and delivery review.
Discuss your project ↗
YUESHANDECODesign-led custom furniture & FF&E delivery partner in ChinaSubmit a project ↗