Map every handoff
List factory dispatch, consolidator, carrier, port or terminal, receiver, warehouse, final-mile carrier and installer. The commercial contract decides responsibility; the condition record shows what was observed.
Factory dispatch evidence
Connect item codes to packing records, quantity, carton or crate condition, container loading and seal information where applicable.
Receiving inspection
Inspect the exterior before signing, note exceptions on the receiving record and isolate wet, crushed, pierced or unstable packages for controlled opening.
Concealed damage
For stone, glass, finished faces and other high-risk items, agree witnessed or recorded first opening. Keep packaging until the condition and parts are confirmed.
Storage and site transfer
Record location, protection, environmental exposure and the next party accepting custody. Do not let unpacked items lose their IDs.
Build the claim file
Keep the order and specification reference, packing record, handoff documents, photos, date, damage description, repair or replacement proposal and correspondence together.
What belongs on a receiving discrepancy record?
Use one record per affected item or clearly identified group. Link carton/crate code to the item and room schedule before unpacking separates the product from its label. Describe what was observed, not an assumed cause or responsible party.
- Date/time, location, shipment reference, carton and item codes.
- Expected and received quantity; packaging and item condition.
- Photo references showing identification, overall condition and the affected detail.
- Person receiving, previous/next custody party and storage location.
- Exception, immediate protective action, notification reference, action owner and current status.
What if the outer carton looks intact?
Record visible condition at receipt and agree a controlled first-opening process for sensitive items. If concealed damage is discovered, preserve item identification, photographs and relevant packaging where safe. Follow the actual carrier, insurer and contract procedures promptly; there is no universal claim deadline in this guide.
Do not attempt unsafe unloading, move unstable stone or glass for a photograph, or make a repair that destroys evidence without the appropriate instruction. Seek the appointed receiving or claims contact's direction. Record subsequent handling so the gap between receipt and discovery remains understandable.
Does a condition record decide who pays?
No. It preserves observations and traceability. Responsibility, coverage, notification requirements and remedies depend on the actual agreements and applicable rules; obtain qualified advice for a dispute. Avoid assigning blame solely from the location where damage was noticed.
Track the proposed remedy separately: repair, replacement, missing-part supply or further review. Give it an owner, target date and acceptance record, then carry any unresolved item into handover. Do not mark an issue closed merely because the shipment has arrived.
Carry unresolved delivery items into closeout ↗
Build a Traceable Receiving Record
Carrier terms and claim deadlines vary; this guide does not assign contractual or legal liability.
Submit your project for review ↗Sources
Last reviewed: September 9, 2026. External guidance can change; verify current project requirements.
YUESHANDECODesign-led custom furniture & FF&E delivery partner in ChinaSubmit a project ↗